Overview

Vishnu Varathan Mills, a textile manufacturing unit, has installed a 110 kW AC (140 kW DC) solar rooftop system using high wattage Goldi 590 Wp panels to reduce power costs and carbon footprint.

Execution

Vishnu Varathan Mills, operating 24/7 shifts with high energy demand (spinning, dyeing, finishing), decided to deploy a solar system on the rooftops of its factory buildings. They chose a Solis inverter for reliable, three-phase performance and paired it with Goldi 590 Wp high-efficiency panels to maximize output per square meter.

Result

Electricity Bill Reduction: With the solar installation contributing a chunk of the daytime load, the mill now sees an estimated 12-15% drop in electricity bills.

CO₂ Emission Prevention: The clean energy produced helps avoid roughly 170-200 tonnes of CO₂ emissions per year, depending on actual solar yield and grid emissions factor.

Monitoring & Control: Real-time monitoring tools allow mill operators to see energy generation and spot under-performance, enabling timely maintenance.

Enhanced Property & Brand Value: The investment strengthens Vishnu Varathan Mills’ sustainability credentials, improving asset value and making it more appealing to clients concerned about environmental responsibility.

Project Gallery

About the Project

Service

Rooftop Solar

Client

Vishnu Varathan Mills

Date

Location

Coimbatore

We’re just a message away.