Coimbatore has quietly become Tamil Nadu’s rooftop solar capital. As of July 2026, the district led the state with 10,725 rooftop solar installations benefiting 15,889 households under PM Surya Ghar, ahead of Chennai (DT Next, citing Lok Sabha data). If you’re one of the many homeowners now checking the solar panel price in Coimbatore, this guide gives you the 2026 numbers in one place.
- In 2026, a home rooftop solar system in Coimbatore costs about ₹75,000-85,000 for 1kW, ₹1.5-2.2 lakh for 3kW and ₹2.6-3.6 lakh for 5kW before subsidy.
- Eligible homes get up to ₹1 lakh in subsidy (₹78,000 central plus ₹22,000 from Tamil Nadu), so a 3kW system costs about ₹50,000-1.2 lakh after subsidy.
- You apply through the PM Surya Ghar portal, and TNPDCL (formerly TANGEDCO) fits the net meter for ₹2,764 (single-phase) or ₹5,011 (three-phase).
Below, you’ll find the full 1kW-10kW price table, what pushes a Coimbatore quote up or down, which size fits your TNEB bill, and the exact steps from application to subsidy.
Get rooftop solar for your home with up to ₹78,000 PM Surya Ghar subsidy, paid straight to your bank.
Solar Panel Price in Coimbatore 2026: 1kW to 10kW
These are on-grid systems with DCR panels installed, which is what most Coimbatore homes choose.
| System size | Suits bimonthly use* | Market price (before subsidy) | Central subsidy | TN top-up | Total subsidy | Approx. cost after subsidy |
| 1kW | Up to 300 units | ₹75,000 – ₹85,000 | ₹30,000 | ₹5,000 | ₹35,000 | ₹40,000 – ₹50,000 |
| 2kW | 300 – 600 units | ₹1.1 – ₹1.6 lakh | ₹60,000 | ₹10,000 | ₹70,000 | ₹40,000 – ₹90,000 |
| 3kW | 600 – 900 units | ₹1.5 – ₹2.2 lakh | ₹78,000 | ₹22,000 | ₹1,00,000 | ₹50,000 – ₹1.2 lakh |
| 5kW | 900 – 1,500 units | ₹2.6 – ₹3.6 lakh | ₹78,000 | ₹22,000 | ₹1,00,000 | ₹1.6 – ₹2.6 lakh |
| 10kW | 1,500+ units | ₹5 – ₹6.5 lakh | ₹78,000 | ₹22,000 | ₹1,00,000 | ₹4 – ₹5.5 lakh |
About these prices: they’re indicative 2026 market ranges, not fixed Kondaas prices. Your final quote depends on your roof, structure height, panel and inverter brand, and whether you need three-phase. The subsidy is credited to your bank account after commissioning, so you pay the full amount first. The Tamil Nadu top-up applies to eligible homes registered on the PM Surya Ghar portal on or after 5 August 2026.
Notice that the subsidy stops growing at 3kW. That makes 3kW the sweet spot for many Coimbatore families: it earns the full ₹1 lakh, and the after-subsidy price can fall to about half the sticker price.
For the same table for other cities, see our guides to solar panel price in Chennai
What Makes a Solar Quote in Coimbatore Go Up or Down?
Two neighbours on the same street can get quotes ₹50,000 apart for the same 3kW system. Here’s where the difference comes from.
1. Panels: DCR vs non-DCR, PERC vs TOPCon
Panels are the biggest cost. To claim the PM Surya Ghar subsidy, you must use DCR panels, which have Indian-made cells. In January 2026, DCR TOPCon panels cost about ₹27.44 per watt wholesale, against ₹16.36 for non-DCR (JMK Research). For a subsidised home, DCR is still the better deal, because the subsidy more than covers the gap.
Our DCR vs non-DCR guide explains the details.
2. Structure: built for Coimbatore’s wind
This is the Coimbatore-specific factor most quotes don’t explain. The Palghat Gap funnels strong winds into Coimbatore, especially during the southwest monsoon months. That’s why the region has so many wind farms. Your mounting structure has to be designed for it:
- Heavier-gauge GI or aluminium sections, properly anchored to the roof
- Lower tilt and secure clamping on exposed rooftops
- Elevated structures cost more, but they let you keep using the terrace
A cheap, thin structure is the most common way a low quote “saves” money. Ask what wind speed the structure is rated for.
3. Inverter and phase
Systems up to about 3kW usually run on a single-phase inverter. For 5kW and above, most homes need a three-phase connection and inverter, such as the SOFAR 3-phase inverter. If your house is single-phase and you want 5kW, factor in the cost and time of a phase change with TNPDCL.
4. Earthing, wiring and the net meter
Earthing, a lightning arrester, DC/AC protection boxes and quality cables add a modest amount, but they’re what keep the system safe for 25 years. The TNPDCL net meter costs ₹2,764 for single-phase and ₹5,011 for three-phase. Check whether your quote includes it.
TOPCon panels, such as the Adani TOPCon 550W, cost a little more than older Mono PERC panels, but they handle Coimbatore’s summer heat better and degrade more slowly.
Which Solar System Size Suits Your Coimbatore Home?
Size your system from your bimonthly units, not your bill amount, and keep two Tamil Nadu rules in mind.
Rule 1: free units change the maths. Under a 2026 Tamil Nadu change reported in May 2026 (TNERC Order No. 5 of 2026), households using up to 500 units per billing cycle get 200 free units instead of 100. Homes above 500 units still get 100 free units. In practice:
- Under about 400 units per cycle: your bill is already low, and solar savings will be modest. A 1kW system, or waiting, may make more sense.
- 500-900 units per cycle: solar cuts into the higher-priced slabs, where savings are strongest. A 2-3kW system usually fits.
- 900+ units per cycle (several ACs, EV charging): 5kW or more gives the biggest return.
Rule 2: surplus units lapse on 31 March. Under Tamil Nadu’s domestic net metering, units you export are adjusted against what you use. Any surplus left at the end of March each year lapses without payment, so oversizing the system doesn’t pay.
| Your home | Typical bimonthly units | Suggested size | Roof space (approx.) |
| Small family, fans, fridge, TV | 300-500 | 1-2kW | 10-20 m² |
| 1-2 ACs, washing machine, motor pump | 600-900 | 3kW | 30 m² (~320 sq ft) |
| 3+ ACs or an EV | 900-1,500 | 5kW | 50 m² (~540 sq ft) |
| Large house, heavy daytime use | 1,500+ | 8-10kW | 80-100 m² |
Roof space based on MNRE’s guide of about 10 m² per kW of shade-free area.
On-grid, hybrid or off-grid?
Most Coimbatore homes choose on-grid: it’s the cheapest option, qualifies for the subsidy, and city supply is generally reliable. If your area sees frequent outages, a hybrid system adds battery backup at a higher cost.
Compare all three in our on-grid vs off-grid vs hybrid cost guide.
How Much Will Solar Save in Coimbatore?
Coimbatore’s climate suits solar well. Its dry, sunny months give strong generation, and its milder temperatures help panels perform better than in hotter coastal or interior towns. Expect roughly:
| System | Units on a clear day | Units per billing cycle (approx.) |
| 1kW | 4 – 5.5 | 240 – 300 |
| 3kW | 12 – 16 | 720 – 900 |
| 5kW | 20 – 27 | 1,200 – 1,500 |
How much this saves in rupees depends on which slabs those units replace. Under the 2025-26 domestic slabs, units in the higher slabs cost roughly ₹6-8 or more each, so solar saves the most for homes with high bills. Bring your last three TNPDCL bills to a site survey and ask for a written estimate of units generated and bill savings.
One maintenance tip for Coimbatore: dust from roads, construction and nearby mills settles on panels and cuts output. Rinsing the panels with plain water every two to three weeks, early in the morning, keeps generation close to its best.
TNEB Net Metering and Subsidy: Step by Step
Here’s how the process works for a Coimbatore home, from application to subsidy:
- Register on pmsuryaghar.gov.in: select Tamil Nadu and TNPDCL, then enter your TNEB consumer number and linked mobile number.
- Apply for rooftop solar: systems up to 10kW don’t need a separate feasibility study under TNERC rules.
- Choose a registered vendor: only registered vendors can install systems that qualify for the subsidy.
- Installation: the vendor installs DCR panels, the inverter, earthing and protection, then uploads the details.
- Inspection and net meter: TNPDCL inspects the system and fits a bidirectional net meter.
- Commissioning: the commissioning certificate is updated on the portal.
- Subsidy: add your bank details, and the central subsidy and state top-up are credited directly to your account.
For screen-by-screen help, see our TANGEDCO net metering application guide.
TNPDCL’s Coimbatore region aims to cover 30,000 homes with rooftop solar by March 2027 (IANS, October 2025), and the current PM Surya Ghar scheme also runs until 31 March 2027. Applying early avoids the year-end rush.
Worked Example: A 3kW System for a Coimbatore Home
Here’s how the numbers come together for a typical family in Saravanampatti or Vadavalli using about 800 units per billing cycle, with two ACs and a motor pump:
| Step | Amount |
| 3kW on-grid system with DCR panels (mid-range quote) | ₹1,80,000 |
| TNPDCL net meter (single-phase) | ₹2,764 |
| You pay upfront | ₹1,82,764 |
| Central subsidy (PM Surya Ghar), after commissioning | – ₹78,000 |
| Tamil Nadu top-up, after commissioning | – ₹22,000 |
| Your net cost | ₹82,764 |
A 3kW system produces roughly 720-900 units per billing cycle on good days, which covers most of this family’s use and removes their most expensive slab units. The net cost is less than half the upfront price, which is why so many Coimbatore homes are choosing 3kW.
Paying for it: loans and cash flow
Because the subsidy arrives only after commissioning, you need the full amount upfront. Public sector banks offer rooftop solar loans linked to PM Surya Ghar, and you can choose the loan option when you apply on the portal. Interest rates and documents vary by bank, so confirm with your branch. Many families use the subsidy, once credited, to prepay part of the loan.
See our overview of solar loan schemes in India.
How to Choose a Solar Installer in Coimbatore
With so many installers now active in Coimbatore, compare them carefully. Before you sign:
- Check registration: the installer should appear on the PM Surya Ghar vendor list for TNPDCL.
- Get an itemised quote: panel brand and model (with DCR status), inverter, structure type and height, earthing, net meter and installation, each listed separately.
- Ask about wind design: the structure should be rated for Coimbatore’s wind, not a generic frame.
- Ask for a written generation estimate: units per year, based on your roof and shade.
- Check local service: who cleans, monitors and repairs the system after installation, and how fast they respond.
- See real work: ask for two or three completed installations near your area.
For a wider comparison of local installers, see our guide to rooftop solar companies in Coimbatore.
Why Coimbatore Homeowners Choose Kondaas
Kondaas was founded in Coimbatore in 1995 and has installed rooftop solar across Tamil Nadu and Kerala for decades. For a Coimbatore home, we offer:
- A free site survey: roof, shade, wind exposure and your TNPDCL bills, to recommend the right size
- A clear, itemised quote: named panel and inverter brands, structure specification and every cost listed
- End-to-end paperwork: PM Surya Ghar registration, TNPDCL net metering, commissioning and subsidy follow-up
- Local service: cleaning, monitoring and maintenance from a team based in Coimbatore
Running a business, school or factory? See our commercial solar solutions.
Conclusion
The solar panel price in Coimbatore in 2026 ranges from about ₹75,000 for 1kW to ₹6.5 lakh for 10kW before subsidy. With up to ₹1 lakh in central and state subsidy, a 3kW system can cost as little as ₹50,000. Size it to your bimonthly units, insist on DCR panels and a wind-rated structure, and compare itemised quotes.
Get your exact price. Book a free site survey with Kondaas, Coimbatore’s rooftop solar company since 1995. We’ll check your roof, review your TNPDCL bills and handle the subsidy and net metering from start to finish.
Book a Free Site Survey
FAQs about home solar
-
What is the solar panel price in Coimbatore in 2026?
About ₹75,000-85,000 for 1kW, ₹1.5-2.2 lakh for 3kW and ₹2.6-3.6 lakh for 5kW before subsidy. After up to ₹1 lakh in subsidy, a 3kW system costs about ₹50,000-1.2 lakh.
-
What is the 3kW solar panel price in Coimbatore with subsidy?
About ₹50,000-1.2 lakh after the combined ₹1 lakh subsidy (₹78,000 central plus ₹22,000 from Tamil Nadu), on a market price of ₹1.5-2.2 lakh.
-
What is the solar panel price in Tamil Nadu?
Prices are broadly similar across Tamil Nadu: about ₹1.5-2.2 lakh for 3kW and ₹2.6-3.6 lakh for 5kW before subsidy. Coastal cities may cost slightly more because of corrosion-resistant structures.
-
How much subsidy can I get for solar in Coimbatore?
₹35,000 for 1kW, ₹70,000 for 2kW and ₹1,00,000 for 3kW and above, combining PM Surya Ghar and the Tamil Nadu top-up. You need DCR panels and a registered vendor.
-
What is the TNEB net meter charge in Coimbatore?
₹2,764 for a single-phase connection and ₹5,011 for three-phase, paid for the TNPDCL bidirectional net meter.
-
Is solar worth it if I get free electricity units in Tamil Nadu?
It depends on your usage. If you use under about 400 units per billing cycle, savings are modest. If you use 600 units or more, solar replaces your most expensive units and pays back much faster.
-
What happens to extra solar units in Tamil Nadu?
They’re adjusted against your consumption. For homes, any surplus left on 31 March each year lapses without payment, so size the system to your actual usage.
-
How many solar panels do I need for a 3kW system?
About 6 panels of 550W, which need roughly 30 m² (about 320 sq ft) of shade-free roof.
-
Does Coimbatore’s wind affect solar installation?
Yes. Strong winds through the Palghat Gap mean the mounting structure must be properly designed and anchored. Always ask your installer about the structure’s wind rating.