You can check your PM Surya Ghar subsidy status in 3 simple steps: log in at pmsuryaghar.gov.in with your registered mobile number, go to Consumer Login, and view your application stage instantly. The portal tracks all 7 stages from feasibility approval to final subsidy disbursement, so you always know exactly where your application stands.

PM Surya Ghar Subsidy Status

Applied for PM Surya Ghar and not sure where your subsidy stands?
Here’s your status, how to check it, and why it might be stuck all in one place.

Log in at pmsuryaghar.gov.in → Consumer Login → using your registered mobile number or electricity consumer number.

Your dashboard shows your current stage feasibility, inspection, net meter, or subsidy credited. Once your commissioning certificate is issued, the subsidy is credited to your Aadhaar-linked bank account, usually within 30–45 working days. If your status hasn’t moved in over 3 weeks, contact your DISCOM or call the helpline 15555.

How to Apply for PM Surya Ghar Yojana (Quick Summary)

  • Visit pmsuryaghar.gov.in and click “Apply for Rooftop Solar”
  • Register with your state, DISCOM, consumer number, mobile, and email
  • Fill the application form and upload all required documents
  • Wait for DISCOM feasibility approval (usually 15–30 days)
  • Select a registered vendor from the portal after feasibility clears
  • Vendor installs the system after DISCOM site inspection
  • Final DISCOM inspection and commissioning certificate issued
  • Subsidy credited to your bank account within 30 working days via DBT

This guide walks you through everything, step by step.

Read this – is the PM Surya Ghar subsidy ending

What is PM Surya Ghar Muft Bijli Yojana?

Launched on February 13, 2024, the PM Surya Ghar: Muft Bijli Yojana is a central government initiative with a budget outlay of over ₹75,000 crore. The goal is to install rooftop solar panels in 1 crore Indian households and give them up to 300 units of free electricity every month. Eligible families also receive a direct subsidy of up to ₹78,000 depending on the system size.

The scheme is managed through a centralized national portal pmsuryaghar.gov.in and all applications are processed through your local electricity distribution company (DISCOM).

Solar Panels & Inverters

PM Surya Ghar 2.0 vs 1.0: What’s Actually Different?

If you’ve seen headlines about “PM Surya Ghar 2.0,” here’s the honest picture:
it’s not officially launched. As of now, it remains under discussion at the ministry level the scheme currently live, processing applications, and paying out subsidies is still the original PM Surya Ghar (what we’re calling “1.0” here for clarity).
That said, it’s worth knowing what’s being proposed, so you’re not caught off guard by rumors or delaying your own application while waiting for something unconfirmed.

PM Surya Ghar (Current, Live)PM Surya Ghar 2.0 (Proposed, Not Live)
StatusLive and processing applicationsUnder ministry-level discussion only
Subsidy structureFlat, capacity-based (up to ₹78,000)Proposed shift toward performance-based incentives tied to actual generation
Battery storagePermitted but not subsidizedProposed separate financial support for battery storage
EligibilityIndividual homeowners with a rooftopProposed expansion to apartment residents and low-income households via shared community solar
TrackingManual application dashboardProposed “digital solar passport” for real-time output and service history

None of the PM Surya Ghar 2.0 proposals are confirmed policy, and there’s no announced timeline for when or if they’ll take effect. If you’re eligible for the subsidy today, applying under the current scheme is the more reliable path than waiting for changes that may take months or years to materialize, if they happen at all.

For a deeper look at whether it’s worth waiting, see our full breakdown: PM Surya Ghar 2.0: Is It Really Coming?

How to Check PM Surya Ghar Consumer Login & Status

PM Surya Ghar Consumer Login

If you’ve already registered, use consumer login to track your status:

  • Go to pmsuryaghar.gov.in and click “Consumer Login”
  • Log in with your registered mobile number, email ID, or electricity consumer number
  • Enter the OTP sent to your registered mobile
  • Select your state and DISCOM from the dropdown
  • Your dashboard opens showing your current application stage

Getting “Account Not Found” or stuck at OTP?
Clear your browser cache and try an incognito window, or use the PM Surya Ghar mobile app from the Play Store it tends to stay logged in more reliably than the browser.

Via the Mobile App

  • Download “PM Surya Ghar” from the Google Play Store
  • Log in with your registered credentials
  • View real-time updates, inspection alerts, and subsidy notifications
  • iOS users can track via the QR code on the official portal

PM Surya Ghar Helpline Number: For application queries, you can call the toll-free number 15555 available for all PM Surya Ghar related issues.

Check if your home qualifies for Kondaas install

Got a Rectification Request? What It Means and How to Clear It

If your application shows a defect or rectification request after installation, don’t panic. It doesn’t mean your subsidy is rejected. It means an inspector found something that has to be fixed and proven before the application can move forward.

What a rectification request is

After your system is installed, MNRE arranges third-party field quality inspections (FQI) on a sample of PM Surya Ghar installations. If the inspector finds a problem, a defect is raised against your application. It’s assigned to your vendor (installer), not to you.

Typical things inspectors flag include:

  • Installation issues, such as earthing, cabling or the mounting structure
  • Missing paperwork you should have received, such as:
    • an O&M manual covering the plant’s main components
    • OEM warranty documents showing the serial numbers of your panels and inverter
    • a system warranty covering 5 years from commissioning

Who uploads the proof

Your vendor does, not you. Under MNRE’s October 2026 guidance, vendors upload rectification proof from their Vendor Main login, in the FQI Defect module. They have 15 days to fix the defects and upload the evidence.

You won’t find an upload option in your consumer login for this. If you see a defect or rectification status, the fastest fix is to call your installer.

What you need to do

  1. Call your installer as soon as you see the request. The 15-day window is short, and installers handle many applications at once.
  2. Ask which defects were raised. The full defect list shows in the vendor’s login, so ask them to share it with you.
  3. Let them fix the issue at your site, then check the work yourself.
  4. Make sure you’ve received your documents: the O&M manual, OEM warranties with serial numbers, and the 5-year system warranty.
  5. Sign the declaration only after the work is done. The portal generates a declaration. The vendor prints it on their letterhead, signs and stamps it, and you countersign it to confirm the rectification.
  6. Follow up until your status moves. If the installer doesn’t respond, raise a complaint through the portal or call the PM Surya Ghar helpline on 15555.

What the vendor must upload (share this with your installer)

ProofRequirement
Photos of the corrected workGeo-tagged and time-stamped
Inverter generation readingIf the inverter display doesn’t show cumulative generation, upload a geo-tagged photo from the inverter’s mobile app showing cumulative generation and the inverter serial number
Status of each defectTick the rectification status box for every defect, add remarks and attach proof
DeclarationPortal-generated, printed on vendor letterhead, signed and stamped by the vendor, countersigned by the consumer
File formatSingle extension only (e.g. .pdf). File names with letters, numbers and underscores only. Double extensions are rejected
“Malicious PDF File” errorRecreate the PDF with Adobe Acrobat or Microsoft Print to PDF and upload it again

Two things the portal won’t accept as proof:

  • The MNRE undertaking for repeated serial number applications. Use the portal-generated declaration instead.
  • Photos of documents being handed to the consumer. Upload PDF copies of the documents.

A rectification request means an inspector found a defect after installation. Your installer has 15 days to fix it and upload geo-tagged photo proof and a declaration signed by both of you, from their vendor login. Your job is to get them moving, check the fix, and countersign the declaration.

MNRE hasn’t published what happens if the 15-day deadline is missed. Treat it as a hard deadline. An open defect can hold your application at this stage.

PM Surya Ghar Consumer Registration

Haven’t applied yet? – Registration takes about 10 minutes if your documents are ready:

  • Visit pmsuryaghar.gov.in and click “Apply for Rooftop Solar”
  • Register with your mobile number you’ll receive an OTP for verification
  • Enter your state, DISCOM, and electricity consumer number
  • Fill in personal details name, address, and contact information
  • Upload your latest electricity bill and Aadhaar
  • Submit you’ll get an application ID to track your status going forward

Keep your consumer number handy exactly as it appears on your electricity bill a mismatch here is one of the most common reasons feasibility checks get stuck (more on this below).

What Each PM Surya Ghar Status Means (and What to Do If You’re Stuck)

Find the status shown on your consumer dashboard below. Each row tells you who needs to act next and what you can do if nothing has changed for a while. The exact wording can vary slightly between DISCOMs.

Status on your dashboardWhat it meansWho acts nextIf it’s stuck, do this
Application submittedThe portal has your applicationDISCOMWait for the feasibility check. Make sure your consumer number matches your electricity bill exactly
Feasibility pendingDISCOM is checking your connection and transformer capacityDISCOMAfter 15 – 30 days, contact your DISCOM section office. Transformer capacity is a common hold-up
Feasibility approved / Vendor selection pendingApproved. You now need to pick a registered vendorYouSelect a vendor on the portal. Many applications stall here because people miss this step
Installation pendingVendor selected, system not yet installedVendorAsk your vendor for an installation date
Installation details submittedVendor has uploaded installation detailsDISCOMWait for the DISCOM inspection to be scheduled. Follow up with your section office if it takes weeks
Inspection scheduled / Net meter pendingDISCOM inspection and bi-directional meter installationDISCOMMetro areas often have net meter backlogs. Follow up with your DISCOM, with your application number ready
Commissioning certificate issuedFinal technical sign-off done–Check that your bank details are correct and Aadhaar-linked
Defect raised / Rectification requestedA quality inspection found something to fixVendorSee “Got a Rectification Request?” above. Your vendor has 15 days
Subsidy request submitted / Subsidy processingYour subsidy claim is being processedMNRE / bankSubsidy is usually credited within 30 working days. If it’s late, check bank Aadhaar linking first
Subsidy creditedPaid to your bank account by DBT–Done. Check your bank statement
Application rejected / ReturnedSomething didn’t match or was missingYouRead the remark on your dashboard, correct it, and reapply or resubmit. Mismatched consumer numbers and blurry documents are the usual causes

Your dashboard status tells you who has to act next. If it’s “Vendor selection pending” or “Rejected/Returned”, the next step is yours. For “Feasibility” and “Net meter” statuses, it’s your DISCOM. For “Rectification requested”, it’s your vendor.

Check this solar cost in Tamil Nadu after subsidy

Documents Required for Solar Subsidy in India

This is where most applications get stuck. Having the right documents ready before you apply saves weeks of back-and-forth. 

Here is the complete list of documents required for the PM Surya Ghar solar subsidy:

DocumentPurpose
Aadhaar CardIdentity proof mandatory for DBT subsidy transfer
Recent electricity billConfirms your consumer number and connection type
Bank account passbook / cancelled chequeRequired for direct benefit transfer of the subsidy amount
Passport-size photographApplication identity requirement
Address proofVoter ID, ration card, or utility bill showing residential address
Property ownership proofSale deed, property tax receipt, or NOC from owner if rented
Mobile number (linked to Aadhaar)OTP verification and portal registration
Email IDPortal registration and communication

Pro Tip: Make sure your bank account is linked to your Aadhaar before applying. The subsidy is transferred via Direct Benefit Transfer (DBT) and an unlinked account will delay your payment by weeks.

Check this also rooftop solar cost in Kerala after subsidy

PM Surya Ghar Solar Subsidy Amount – How Much Will You Get?

The subsidy depends on the size of the solar system you install. 

Here is the current structure for general states:

System SizeSubsidy AmountFree Units per Month (Approx)
1 kW₹30,000Up to 75 units
2 kW₹60,000Up to 150 units
3 kW & Above₹78,000 (capped)300+ units

For special category states Uttarakhand, Himachal Pradesh, J&K, Ladakh, North-East states, and island territories of Andaman & Nicobar and Lakshadweep different benchmark rates apply. Always check the MNRE guidelines or the official portal for your state’s specific amounts.

Read Tamil Nadu solar subsidy guide

Took a Solar Loan? Check Your Loan Status on JanSamarth

If you applied for a PM Surya Ghar solar loan, track it separately from your subsidy. Loan applications under the scheme run through the government’s JanSamarth portal, which is linked to PM Surya Ghar. Many banks also accept applications at their branches.

To check your loan status:

  1. Go to jansamarth.in and log in with the mobile number you used to apply.
  2. Open “My Applications” on your dashboard.
  3. Your loan application and its current status will show there.

If you applied at a bank branch rather than through JanSamarth, ask the branch for your status. Have your PM Surya Ghar application number ready, because banks often verify it against your DISCOM status before they pay out.

For bank-by-bank rates and terms, see our guide on choosing a solar loan bank.

Common Reasons Applications Get Delayed

From experience guiding applicants through this process, these are the top reasons people wait months without an update:

  • Incomplete documents: Missing bank Aadhaar linkage or uploading blurry scans
  • Pending vendor selection: Many applicants get feasibility approval but forget to pick a registered DISCOM vendor on the portal
  • Net metering delay: DISCOM backlogs for bi-directional meter installation are common in metro areas
  • Incorrect consumer number: A mismatch between your portal registration and your electricity bill stalls feasibility checks
  • Site inspection not scheduled: In some areas, applicants need to actively follow up with their DISCOM office to schedule the inspection

If your status hasn’t changed in 3 – 4 weeks: Log in to the portal, identify which stage is stuck, and contact your DISCOM directly. You can also call the 15555 PM Surya Ghar Helpline Number to raise a complaint.

Check 5kW solar panel system price in India

Final Word

The PM Surya Ghar Muft Bijli Yojana is one of the most impactful solar subsidy programs India has launched. The process is straightforward once you know the stages and have your documents for solar subsidy in India ready from day one. Keep your Aadhaar-linked bank account handy, choose a DISCOM-registered vendor, and check your portal status every 10–15 days to catch any pending actions.

Free electricity isn’t just a promise it’s a reachable outcome for most Indian households willing to put in the initial paperwork.

Looking for a subsidy-eligible system? Kondaas helps homeowners choose the right PM Surya Ghar eligible installation for their needs.

FAQs

  1. How do I check my PM Surya Ghar subsidy status online?

    Log in at pmsuryaghar.gov.in using Consumer Login with your mobile number or consumer number. Your dashboard displays your current stage in real time.

  2. How do I check my PM Surya Ghar login registration status?

    After registering, log in with the same mobile number used during registration. If your registration is still processing, you’ll see “Application Submitted” as your current stage rather than a further-along status.

  3. What is the PM Surya Ghar consumer login process?

    Visit the official portal, select Consumer Login, enter your registered mobile number or consumer number, verify via OTP, then select your state and DISCOM to view your dashboard.

  4. How do I check my PM Surya Ghar Muft Bijli Yojana subsidy status?

    Your subsidy status is shown as one of the final stages on your consumer dashboard “Commissioning Certificate Issued” comes first, followed by “Subsidy Processing” and then “Subsidy Credited.”

  5. How do I complete PM Surya Ghar consumer registration?

    Go to “Apply for Rooftop Solar” on pmsuryaghar.gov.in, verify your mobile number via OTP, enter your DISCOM and consumer number, and upload your electricity bill and Aadhaar.

  6. What is the PM Surya Ghar helpline number?

    15555 (toll-free), for login issues, status queries, and subsidy grievances.

  7. What does “rectification requested” mean in PM Surya Ghar?

    It means a third-party quality inspection found a defect after installation. Your vendor has 15 days to fix it and upload geo-tagged photo proof, plus a declaration you both sign, from their vendor login. Contact your installer straight away.

  8. How do I check my PM Surya Ghar loan status?

    Log in to jansamarth.in with the mobile number you applied with and open “My Applications”. If you applied at a bank branch, ask the branch directly.

Source: Ministry of New and Renewable Energy (MNRE), Order No. 318/17/2024-Grid Connected Rooftop, Guidelines for PM-Surya Ghar: Muft Bijli Yojana, dated 16 March 2024.
Scheme approved by the Union Cabinet on 29 February 2024, with a total outlay of ₹75,021 crore through FY 2026–27.
Official source: MNRE – PM-Surya Ghar Guidelines

Last updated: 2026