Overview
Vishnu Varathan Mills, a textile manufacturing unit, has installed a 110 kW AC (140 kW DC) solar rooftop system using high wattage Goldi 590 Wp panels to reduce power costs and carbon footprint.
Execution
Vishnu Varathan Mills, operating 24/7 shifts with high energy demand (spinning, dyeing, finishing), decided to deploy a solar system on the rooftops of its factory buildings. They chose a Solis inverter for reliable, three-phase performance and paired it with Goldi 590 Wp high-efficiency panels to maximize output per square meter.
Result
Electricity Bill Reduction: With the solar installation contributing a chunk of the daytime load, the mill now sees an estimated 12-15% drop in electricity bills.
CO₂ Emission Prevention: The clean energy produced helps avoid roughly 170-200 tonnes of CO₂ emissions per year, depending on actual solar yield and grid emissions factor.
Monitoring & Control: Real-time monitoring tools allow mill operators to see energy generation and spot under-performance, enabling timely maintenance.
Enhanced Property & Brand Value: The investment strengthens Vishnu Varathan Mills’ sustainability credentials, improving asset value and making it more appealing to clients concerned about environmental responsibility.



