April 4, 2026
Kondaas Automation – Solar India 2025
MNRE 2025

India’s Solar Future — Know Your Numbers

State-wise solar capacity & PM Surya Ghar subsidy guide for Indian homeowners

132+ GW
Total Solar Installed Capacity in India (2025)
1

Solar Parks in India: State-wise Capacity (GW)

Rajasthan
23 GW
Gujarat
14 GW
Karnataka
10 GW
Tamil Nadu
9 GW
Andhra Pradesh
8 GW
Maharashtra
5 GW
Telangana
4 GW
Madhya Pradesh
3 GW
📊 Source: MNRE 2025 (Ministry of New & Renewable Energy) *Top 8 states shown
What this means for Indian homeowners: India’s solar boom — led by Rajasthan, Gujarat, and Karnataka — signals massive grid infrastructure being built across the country. For homeowners, this translates to more stable net-metering policies, faster grid approvals, and better ROI on rooftop solar installations. With 132+ GW already installed and a national target of 500 GW by 2030, now is the best time to go solar and lock in subsidies before demand peaks.
2

PM Surya Ghar Solar Subsidy Scheme 2025

🏛️ PM Surya Ghar: Muft Bijli Yojana is a Government of India initiative launched in 2024 to install rooftop solar panels in 1 crore households, providing up to 300 units of free electricity per month and direct financial subsidies through the MNRE portal.

Central Subsidy by System Size

System SizeMonthly GenerationCentral SubsidyStatus
1 kW~90–110 units₹30,000Available
2 kW~180–220 units₹60,000Available
3 kW+280–330+ units₹78,000Available

* Additional state subsidies may apply. Subsidy disbursed directly to bank account post-installation.


Eligibility Checklist

  • Indian residential household (not commercial)
  • Valid electricity consumer number
  • Residential property with adequate rooftop space
  • Active bank account for DBT subsidy transfer
  • No prior solar subsidy claim on same property
  • DISCOM-empanelled installer must be used

5-Step Application Process

01
Register Online
Visit pmsuryaghar.gov.in and register with your electricity consumer number and mobile OTP.
02
Apply for Feasibility
Submit rooftop solar application to your DISCOM through the portal for technical feasibility approval.
03
Select Installer
Choose a MNRE-empanelled vendor (like Kondaas Automation) from the approved list on the portal.
04
Installation & Inspection
Installer completes the work. DISCOM inspects and provides net-meter connection certificate.
05
Claim Subsidy
Submit bank details and commissioning report on the portal. Subsidy credited in 30 days.

Documents Required

🪪 Aadhaar Card (applicant)
Recent Electricity Bill
🏠 Property Ownership Proof
🏦 Bank Passbook / Cancelled Cheque
📸 Passport-size Photograph
📋 Installation Agreement with Vendor
🔌 Net Meter Connection Certificate
📄 Commissioning Report from DISCOM

Interactive Subsidy Calculator

How much subsidy can you get? Select your system size:

Central Subsidy (Direct to Bank Account)

Frequently Asked Questions

Can I get the subsidy for an already installed solar system? +
No. The PM Surya Ghar subsidy applies only to new installations made through the official portal after registration. Existing systems installed before scheme enrollment are not eligible for the central subsidy under this scheme.
How long does it take to receive the subsidy amount? +
After successful installation, net-meter connection, and submission of your bank details and commissioning report on the portal, the subsidy is typically credited to your bank account within 30 working days via Direct Benefit Transfer (DBT).
Is there a state-level subsidy on top of the central subsidy? +
Yes, several states offer additional incentives. For example, Tamil Nadu, Maharashtra, and Gujarat have their own top-up subsidies or accelerated depreciation benefits. Contact Kondaas Automation to check the latest state-specific offers applicable in your area.
What if I live in a rented property or a housing society? +
For rented properties, you need written consent from the property owner and a no-objection certificate. Housing societies can apply as bulk installations under the RWA route, which may qualify for group discounts and higher subsidies.

☀️ Ready to Claim Your Solar Subsidy?

Kondaas Automation’s expert team handles the entire MNRE application process — from documentation to DISCOM approval — at zero hassle for you.

Get Subsidy Assistance →
Kondaas Automation | Solar Energy Solutions | kondaas.com
Data sourced from MNRE 2025. Subsidy amounts are indicative; final disbursement subject to DISCOM approval. © 2025 Kondaas Automation.

Categories

Facts about Solar Products

Tags

Related Posts

We’re just a message away.